Nashville Fire Department Station #33
Client: Messer Construction
Location: Nashville, TN
Project: GHP, teaming with Messer Construction on the Metro Fire Stations Six Pack project, provided design services on the new Metro Fire Station #21.
Client: Messer Construction
Location: Nashville, TN
Project: GHP, teaming with Messer Construction on the Metro Fire Stations Six Pack project, provided design services on the new Metro Fire Station #21. Construction of this 19,133 sq. ft. facility will begin in January 2012, with anticipated completion in October 2012.
Details Include:
LEED Silver certification as a minimum.
-
Cost effective, low maintenance, energy efficient construction.
-
Rainwater harvesting from roof tops for truck washing efficient use of water resources.
-
Incorporation of photovoltaic roof top solar panels
-
A Two-bay Apparatus Truck Bay, including: rappel and climbing practice equipment; a Bunker Gear Room; EMS Clean Storage Room; a Laundry Room; and a Decon Room.
A two-story, fully accessible residential/administrative area including:
-
A fitness area
-
Kitchen / Dining area, fully outfitted with all stainless steel appliances and cabinetry.
-
Day Room/Lounge area adjacent to Kitchen and Dining.
-
Dispatch area adjacent to Day Room
-
Fourteen single occupancy Bunk Rooms, and two Captain’s Bunk Rooms
-
Individual Toilet/Shower Rooms.
-
Private TV lounge, separate from Day Room.
-
Covered Outdoor Patios
-
Exterior Patio with gas grille
An Emergency Generator sized to provide power for 100% of the facility for a minimum of 4 days if called upon in an emergency.
