Wolf Creek Dam Sewer System Improvements

Client: ????

Location: Russell County, KY; Nashville, TN

Project: Gobbell Hays Partners, Inc. provided design and CADD services for this project. The design included new piping and lift station identification along with design of a new septic system and leach field line layout.

Details Include:
• All new system piping was designed from the new power house lift pump to the new septic system approximately 2000 feet downstream.
• Design incorporated connection of four additional bathhouses and dump station in an existing campground facility. 
• GHP produced 35, 65, and 95% drawings and specifications. GHP also coordinated with local and state of Kentucky Health Department officials during the design phases. GHP also has provided for periodic construction administration services during the project.

Click below to view other pictures, or click above to see a larger image.